Joint pipe production line

Processing and molding process
1. Incoming straight tube φ8*1 (theoretical length before molding 43mm-chamfered at both ends)
2. The method of bending the tube first and then molding is adopted.
3. The bending tube clamps the shrinking end and the flaring end is placed at the tail end.
4. The tube end molding design is double-headed at 90°, and the shrinking and flaring are processed at the same time.

\